Bald Mountain


The CVRD assumed responsibility for this system, located in Electoral Area I, on October 1, 2010. The system services 70 lots with a potential build-out of 354 single and multi-family homes.

The treatment plant is a Sanitherm membrane bioreactor plant with two membranes and provision for additional treatment. Discharge of the UV disinfected effluent is into the ground by means of two large infiltration basins.

The 2016 annual Parcel Tax is $306, plus a user charge of $135 per 6-month billing period, or 22.50 per month for a single family dwelling, less 10% for timely period.

Management Bylaw